Monthly Archive for May, 2009

2009/05/20

Painting of the mural continued
Continued grinding & polishing Stainless Steel Hand Rail.
Continued final touches of Rough Tiling.
Continued cutting & polishing of Marble.
The wooden block of Walakulu Bemma continued

Read Full Post »

2009/05/19

Painting of the mural continued
Continued grinding & polishing Stainless Steel Hand Rail.
Continued final touches of Rough Tiling. Completed the round pavement in side of the Lower Maluwa.
Continued cutting & polishing of Marble.
Repairing of Cracked Green Marble completed
The wooden block of Walakulu Bemma continued

Read Full Post »

2009/05/18

Painting of the mural continued
Continued grinding & polishing Stainless Steel Hand Rail.
Stopped brick work on boundary walls due to the amount of bricks
Continued final touches of Rough Tiling. Continued the round pavement in side of the Lower Maluwa.
Continued cutting & polishing of Marble.
Repairing of Cracked Green Marble continued
The concrete mold was discarded because of the [...]

Read Full Post »

2009/05/17

Painting of the mural continued
Continued grinding & polishing Stainless Steel Hand Rail.
Continued brick work on the eastern boundary wall along the access road continued. Continued eastern boundary wall.
Continued final touches of Rough Tiling. Continued the round pavement in side of the Lower Maluwa.
Continued cutting & polishing of Marble.
Wiring in the garden of Uda Maluwa completed
Repairing [...]

Read Full Post »

2009/05/16

Painting of the mural continued
Continued grinding & polishing Stainless Steel Hand Rail.
Continued brick work on the eastern boundary wall along the access road continued. Continued eastern boundary wall.
Continued final touches of Rough Tiling. Continued the round pavement in side of the Lower Maluwa.
Continued cutting & polishing of Marble.
Wiring in the garden of Uda Maluwa continued
Repairing [...]

Read Full Post »

2009/05/15

Painting of the mural continued
Continued grinding & polishing Stainless Steel Hand Rail.
Continued brick work on the eastern boundary wall along the access road continued. Completed South boundary wall. Started eastern boundary wall.
Continued final touches of Rough Tiling. Started the round pavement in side of the Lower Maluwa.
Continued cutting & polishing of Marble.
Wiring in the garden [...]

Read Full Post »

2009/05/14

Continued grinding & polishing Stainless Steel Hand Rail.
Continued brick work on the eastern and south boundary walls along the access road.
Continued final touches of Rough Tiling
Painting of the mural continued
Continued cutting & polishing of Marble.
The design of the Walakulu Bemma was created by one of the Sri Lankan Artists to make the Mold.
Wiring in the [...]

Read Full Post »

2009/05/13

Painting of the mural continued
Continued brick work on the eastern and south boundary walls along the access road.
Continued cutting & polishing of Marble.
Continued grinding & polishing Stainless Steel Hand Rail.
Continued final touches of Rough Tiling

Read Full Post »

2009/05/12

Painting of the mural continued
Continued brick work on the eastern boundary wall along the access road. Started South Boundary Wall
Continued cutting & polishing of Marble.
Continued grinding & polishing Stainless Steel Hand Rail.
Completed fixing fence posts on North boundary wall.
Continued final touches of Rough Tiling

Read Full Post »

2009/05/11

Painting of the mural continued
Continued brick work on the eastern boundary wall along the access road.
Continued cutting & polishing of Marble.
Continued grinding & polishing Stainless Steel Hand Rail.
Continued fixing fence posts on North boundary wall.
Started final touches of Rough Tiling

Read Full Post »