Monthly Archive for June, 2009

2009/06/20

Casting of Walakulu Bemma on the North Boundary wall continued with 05 moulds.
Brick form work of the base of the Pagoda completed
Bar bending work of the foundation, the columns & the Base of the Makara Thorana completed. Base Concreting was done
Continued the door fixing in side of the Right wing building
Continued cutting & polishing of [...]

Read Full Post »

2009/06/19

Casting of Walakulu Bemma on the North Boundary wall continued
Brick form work of the base of the Pagoda started
Bar bending work of the foundation, the columns & the Base of the Makara Thorana continued.
Roof tile painting continued on the Right wing building
Continued the door fixing in side of the Right wing building
Continued cutting & polishing [...]

Read Full Post »

2009/06/18

Casting of Walakulu Bemma on the North Boundary wall continued
Screed concreted the foundation of the Pagoda
Bar bending work of the foundation, the columns & the Base of the Makara Thorana continued.
Roof tile painting continued on the Right wing building
Continued the door fixing in side of the Right wing building
Continued cutting & polishing of Marble.
Tiling in [...]

Read Full Post »

2009/06/17

Casting of Walakulu Bemma on the North Boundary wall continued
Cutting of foundation of the Pagoda was completed
Bar bending work of the foundation of the Makara Thorana continued
Roof tile painting continued on the Right wing building
Continued the door fixing in side of the Right wing building
Continued cutting & polishing of Marble.

Read Full Post »

2009/06/16

Casting of Walakulu Bemma on the North Boundary wall continued
Cutting of foundation of the Pagoda was continued
Steel work & bar bending work of the foundation of the Makara Thorana continued
Roof tile painting continued on the Right wing building
Continued the door fixing in side of the Right wing building
Continued cutting & polishing of Marble.
The Artistic Paintings [...]

Read Full Post »

2009/06/15

Casting of Walakulu Bemma on the North Boundary wall continued
Cutting of foundation of the Pagoda was continued
Steel work of the foundation of the Makara Thorana continued
Roof tile painting continued on the Right wing building
Foundation of the Makara Thorana Leveled and screed concreting done
Continued the door fixing in side of the Right wing building
Continued cutting & [...]

Read Full Post »

2009/06/14

Casting of Walakulu Bemma on the North Boundary wall continued
Cutting of foundation of the Pagoda was started with the chanting of Seth Pirith by the Ven. Dr. Rambukwelle Chandrarathana Thero with the 07 Little Monks
Foundation of the Makara Thorana excavated and completed
Steel work of the foundation of the Makara Thorana continued
Roof tile painting continued on [...]

Read Full Post »

2009/06/13

Casting of Walakulu Bemma on the North Boundary wall started
Clearing continued in the construction area of the Pagoda
Steel work of the foundation of the Makara Thorana continued
Roof tile painting started on the Right wing building
Started the door fixing in side of the Right wing building
Continued cutting & polishing of Marble.
The Artistic Paintings underneath the slab [...]

Read Full Post »

2009/06/12

Casting of Walakulu Bemma on the East Boundary wall completed
Clearing continued in the construction area of the Pagoda
Steel work of the foundation of the Makara Thorana continued
Continued cutting & polishing of Marble.
The Artistic Paintings underneath the slab continued.

Read Full Post »

2009/06/11

Work Stopped due to the unavailability of workers because of the strike
Casting of Walakulu Bemma on the East Boundary wall Continued with 05 Moulds
The construction area of the Pagoda was cleared
Steel work of the foundation of the Makara Thorana continued
Continued cutting & polishing of Marble.
The Artistic Paintings underneath the slab continued.

Read Full Post »