2009/04/28
Apr 30th, 2009 by Kawshala Kapila
- Continued Brick Wall on North Boundary wall for the Walakulu Bemma
- Completed laying of tiles inside of the Pound
- Continued repairing the damaged louvers of the left wing building
- Stainless Steel Hand Rail continued.
- Second coat terracotta paint on right wing roof completed replacing damaged tiles. Small Pavilions continued.
- Glaze tile work continued in 1st floor in side of the left wing building. Continued ground floor. Steps continued.
- Polishing of white Marble Started around Siddhartha Pavilion
- 2 feet wide turfing started around the Second Maluwa
- Started colour washing inside of the right wing building
- Wiring inside of the left wing building continued.
- Plumbing in side of the Left Wing Building continued
- Invitations of the Ceremony given to local monasteries by Rev. Chandrarathana Thero
- SFFL team arrived to Monastery safely