2009/04/29
Apr 30th, 2009 by Kawshala Kapila
- Completed Brick Wall on North Boundary wall for the Walakulu Bemma. Started both Eastern walls.
- Started & completed tiling at Dana Shala.
- Continued repairing the damaged louvers of the left wing building
- Stainless Steel Hand Rail continued.
- Continued Colour washing inside of the right wing building
- Second coat terracotta paint on right wing roof completed replacing damaged tiles. Small Pavilions continued.
- Polishing of white Marble Started around Siddhartha Pavilion
- 2 feet wide turfing continued around the Second Maluwa. Started Lower Maluwa.
- Glaze tile work continued in side of the left wing building. Continued ground floor. Steps continued.
- Wiring inside of the left wing building continued.
- Plumbing in side of the Left Wing Building continued
- Invitations of the Ceremony given to local monasteries by Rev. Chandrarathana
- SFFL team started beatification of Uda Maluwa