  • Completed Brick Wall on North Boundary wall for the Walakulu Bemma. Started both Eastern walls.
  • Started & completed tiling at Dana Shala.
  • Continued repairing the damaged louvers of the left wing building
  • Stainless Steel Hand Rail continued.
  • Continued Colour washing inside of the right wing building
  • Second coat terracotta paint on right wing roof completed replacing damaged tiles. Small Pavilions continued.
  • Polishing of white Marble Started around Siddhartha Pavilion
  • 2 feet wide turfing continued around the Second Maluwa. Started Lower Maluwa.
  • Glaze tile work continued in side of the left wing building. Continued ground floor. Steps continued.
  • Wiring inside of the left wing building continued.
  • Plumbing in side of the Left Wing Building continued
  • Invitations of the Ceremony given to local monasteries by Rev. Chandrarathana
  • SFFL team started beatification of Uda Maluwa