  • Started the mural on left side wall of the Main Mural
  • Continued final touches of Rough Tiling. Started Mosaic Tiling out side round pavement of the Lower Maluwa
  • Continued cutting & polishing of Marble.
  • The wooden block of Walakulu Bemma continued
  • Continued fixing fence posts on western boundary wall.