2009/05/22
May 31st, 2009 by Kawshala Kapila
- Started the mural on left side wall of the Main Mural
- Continued final touches of Rough Tiling. Started Mosaic Tiling out side round pavement of the Lower Maluwa
- Continued cutting & polishing of Marble.
- The wooden block of Walakulu Bemma continued
- Continued fixing fence posts on western boundary wall.
- The new engineer arrived to premises in the evening.