2009/05/24
May 31st, 2009 by Kawshala Kapila
- Continued fixing fence posts on western boundary wall.
- Continued cutting & polishing of Marble.
- The Mural on left side wall of the main mural continued
- Continued Mosaic tiling out side round pavement of the Lower Maluwa. Continued in toilets in ground & 1st floors of the Left wing building.
- Plastering continued inside of the toilets in Left Wing building
- The wooden block of Walakulu Bemma continued