- Completed fixing fence posts on western boundary wall.
- Continued cutting & polishing of Marble.
- The Mural on left side wall of the main mural continued
- Continued Mosaic tiling out side round pavement of the Lower Maluwa. Continued floor tiling & wall tiling in toilets in ground & 1st floors of the Left wing building.
- Plastering continued inside of the toilets in Left Wing building
- The wooden block of Walakulu Bemma completed
- Started fixing wooden blocks of Walakulu Bemma on the East Boundary wall along with the access road
- The alternator of the generator was out of order. Handed over to repair.