  • Casting of Walakulu Bemma on the East Boundary wall along with the access road continued with one mold. Continued making of new 04 molds.
  • Brick work of the east boundary wall restarted.
  • Continued cutting & polishing of Marble.
  • Continued Mosaic tiling out side round pavement of the Lower Maluwa.
  • Continued floor tiling & wall tiling in toilets in side of the Left wing building.
  • The Mural on left side wall of the main mural continued