- Casting of Walakulu Bemma on the East Boundary wall along with the access road continued with one mold. Continued making of new 04 molds.
- Brick work of the east boundary wall restarted.
- Continued cutting & polishing of Marble.
- Continued Mosaic tiling out side round pavement of the Lower Maluwa.
- Continued floor tiling & wall tiling in toilets in side of the Left wing building.
- The Mural on left side wall of the main mural continued