2009/05/29
May 31st, 2009 by Kawshala Kapila
- A Meeting held with Mr. Semage to decide Makara Thorana placing & levels. Main entrance to be filled from both sides with earth to match the levels of Walakulu Bemma & Makara Thorana.
- Casting of Walakulu Bemma on the East Boundary wall along with the access road continued with one mold. Continued making of new 04 molds. Wiring was done to fix GI 6 ft height lamp posts to Walakulu Bemma in every 28 ft intervals.
- Brick work of the east boundary wall continued.
- Continued cutting & polishing of Marble.
- Continued Mosaic tiling out side round pavement of the Lower Maluwa.
- Continued floor tiling & wall tiling in toilets in side of the Left wing building.
- The Mural on left side wall of the main mural continued