2009/05/30
May 31st, 2009 by Kawshala Kapila
- Cutting of the foundation of the Makara Thorana was started at auspicious time (11.45 am) with the chanting of Seth Pirith by Ven. Dr. Rambukwelle Chandrarathana Thero and the Little Monks.
- Casting of Walakulu Bemma on the East Boundary wall along with the access road continued with one mold. Continued making of new 04 molds.
- Brick work of the east boundary wall continued.
- Continued cutting & polishing of Marble.
- Continued Mosaic tiling out side round pavement of the Lower Maluwa.
- Continued floor tiling & wall tiling in toilets in side of the Left wing building.
- One sample of the wired mesh was fixed and approved.
- The Mural on left side wall of the main mural continued