2009/06/18

  • Casting of Walakulu Bemma on the North Boundary wall continued
  • Screed concreted the foundation of the Pagoda
  • Bar bending work of the foundation, the columns & the Base of the Makara Thorana continued.
  • Roof tile painting continued on the Right wing building
  • Continued the door fixing in side of the Right wing building
  • Continued cutting & polishing of Marble.
  • Tiling in side of the Right wing building continued. 90% completed