2009/06/29
Jun 30th, 2009 by Kawshala Kapila
- The Pillars of the Makara Thorana concreted
- Casting of Walakulu Bemma on the South Boundary wall continued
- Continued repairing of Louvers of windows
- Continued cutting & polishing of Marble. Final touches of Steps continued