2009/03/21

  • Continued foundations of the boundary walls North side
  • Glaze tile design and Colour approved for the left wing building
  • White marble work inside of the Siddhartha pavilion continued
  • Contractor came to the site and he was advice to speed up the work. Warned him at least to send a translator to the site