2009/03/21
Mar 22nd, 2009 by Kawshala Kapila
- Continued foundations of the boundary walls North side
- Glaze tile design and Colour approved for the left wing building
- White marble work inside of the Siddhartha pavilion continued
- Contractor came to the site and he was advice to speed up the work. Warned him at least to send a translator to the site