2009/03/22

  • Continued foundations of the boundary walls North side as shown in figure
  • White Marble work inside of the Siddhartha pavilion continued.
  • Sample of glaze tiles for the pond front of Siddhartha pavilion brought.
  • Laying of rough tile on the curved mote wall, sample of 10 ft. shown and approved.
  • Contractor brought estimates for electrical work & plumbing and for the Iron fence.
  • Part of Materials such as Rubble, White & Green Marble and Sand transported to the site