2009/03/22
Mar 22nd, 2009 by Kawshala Kapila
- Continued foundations of the boundary walls North side as shown in figure
- White Marble work inside of the Siddhartha pavilion continued.
- Sample of glaze tiles for the pond front of Siddhartha pavilion brought.
- Laying of rough tile on the curved mote wall, sample of 10 ft. shown and approved.
- Contractor brought estimates for electrical work & plumbing and for the Iron fence.
- Part of Materials such as Rubble, White & Green Marble and Sand transported to the site