2009/03/25
Mar 27th, 2009 by Kawshala Kapila
- Proceeded to Dhangadi (10 Hour journey, One way) to select the Boys to be ordained.
- Obtained over the phone the following work progress during the day.
- Continued the next step of North boundary walls.
- White Marble work inside of the Siddhartha pavilion completed.
- Laying of Green Marble in the Small pavilion, front of Left wing building continued. 50% completed.
- Glaze Tiling on cement benches in side of the Right wing building Started. The second floor of the Left wing building started