2009/03/26

  • Interview was held at Dhangadi Buddhist Temple. 11 boys were Selected. The responsible Lady also in one of the pictures.
  • Continued the next step of North boundary walls. 50% completed
  • Laying of Green Marble in the Small pavilion, front of Left wing building completed.
  • Glaze Tiling on cement benches in side of the Right wing building continued except one bench.
  • The hall of the second floor of the Left wing building continued. 50% completed