2009/04/22

  • Stainless Steel Hand Rail continued
  • Continued laying of 6 in. concrete layer on eastern boundary wall
  • Second coat terracotta paint on right wing roof continued replacing damaged tiles
  • Putting of damage areas of pillars inside of Siddhartha pavilion started
  • Glaze tile work continued in 1st floor in side of the left wing building
  • Wiring inside of the left wing building continued
  • Plumbing in side of the Left Wing Building continued